PAKISTAN
The Oil and Gas Development Company Limited (OGDCL) has successfully revived production from Chak # 2-2 Well, located in the Sinjhoro Block in Sindh’s Sanghar district, according to a company notice submitted to the Pakistan Stock Exchange (PSX).
The Chak # 2-2 Well is a joint venture where OGDCL operates with a 62.5% working interest, alongside Government Holdings (Private) Limited (GHPL) with 22.5% and Orient Petroleum Inc. (OPI) holding 15%.
Following sidetrack and recompletion in the Basal Sand formation, post-completion testing has delivered promising results, with a production rate of 115 barrels of oil per day (BPD) and 7.0 million standard cubic feet per day (MMSCFD) of gas. Additionally, 21 metric tons per day (MTon/D) of LPG is being recovered.
The well has now been integrated into the Sinjhoro Gas Processing Plant, with processed gas being injected into the SSGCL network.
This development underscores OGDCL’s commitment to operational efficiency, reserve optimization, and sustainable energy solutions, reinforcing its position as Pakistan’s leading exploration and production (E&P) company. – ER